Building bridges, sharing knowledge.
In 2022, “Zukunft Bau” tested a new format for the first time that combines the latest findings from science, their implementation in practical construction applications, and the communication of these to a broad audience.
With a focus on climate-neutral building stocks in 2045, the aim was to create a creative, accessible experimental space for three months in which innovative approaches for the construction of the future could be generated and demonstrated: the Zukunft Bau Pop-up-Campus.
The responsibility for VAGEDES & SCHMID was extensive and covered the entire spectrum of live communication. Our well-rehearsed teams with exhibition experience ensured smooth construction, processes and targeted follow-up.
- Client
- BBSR, RWTH Aachen University
- Briefing
- Experimental exhibition for the Future Bau platform
- Location
- Vacant existing building in Aachen near the main train station
- Specials
- Planning and implementation with the BBSR and the RWTH Aachen University after the redesign and change of use of the building
- Event type
- Exhibition